Explain the problem as you see it
Currently there seems to be no way to to merge two workspaces. If I understand correctly there are some features that don't sync across workspaces even if "allow content from" is enabled. For example Schemas and Library don't seem to sync.
Combined with the fact that importing from another tool always creates a new workspace this makes onboarding from other tools messy.
Why is this a problem for you?
I appreciate for what use cases different workspaces might make sense. E.g. privat vs. work. However, trying to transition from Roam it just creates a strange time-based break. One workspace with information from before the switch and one with information after the switch.
I currently have thousands of nodes in Roam and none in Tana. I can't delete the main workspace, but it feels very unnatural to add new nodes to the empty workspace.
Suggest a solution
Ideally the solution to merge workspaces. If that's not possible at least the option to import directly into the main workspace.
If even that isn't possible I'd appreciate some instructions on how I can move every node from workspace. I assume I would have to move every node from "import workspace" library to "main workspace" library (that's 22 pages for me - is there a way to select all of them?) + all nodes from "import workspace" calendar to "main workspace" calendar.